OTHMAN, MUHAMMAD MURTADHA BIN (2004) Evolutionary Programming (EP) Method in the Capacity Benefit Margin (CBM) Assessment of Deregulated Power System. In: UNSPECIFIED.
Full text not available from this repository.Metadata
Item Type: | Conference or Workshop Item (UNSPECIFIED) |
---|---|
PRISMA ID: | 1514 |
URI: | http://oarr.uitm.edu.my/id/eprint/16961 |