MURAD, MAFOZAH BTE (2007) Industrialised building system: project uncertainty and the integration in decision-making. In: UNSPECIFIED.
Full text not available from this repository.Metadata
Item Type: | Conference or Workshop Item (UNSPECIFIED) |
---|---|
PRISMA ID: | 13995 |
URI: | http://oarr.uitm.edu.my/id/eprint/22114 |