TAKIM, ROSHANA BINTI (2005) Process Improvements of Construction Projects in Malaysia: Analysis of Case Studies. In: UNSPECIFIED.
Full text not available from this repository.Metadata
Item Type: | Conference or Workshop Item (UNSPECIFIED) |
---|---|
PRISMA ID: | 15166 |
URI: | http://oarr.uitm.edu.my/id/eprint/22543 |