Home About Browse Policies Statistics

-�The Relevance of Liquidated Damages in Construction Contracts�

HASSAN, NORILA BT ABU (2006) -�The Relevance of Liquidated Damages in Construction Contracts�. In: UNSPECIFIED.

Full text not available from this repository.

Metadata

Item Type: Conference or Workshop Item (UNSPECIFIED)
PRISMA ID: 22272
URI: http://oarr.uitm.edu.my/id/eprint/24764

Actions (login required)

View Item
View Item

Citation