(PROF)(IR)(DR)(HJ), AHMED BIN JAFFAR (2009) Set-up Time Reduction Through Single Minute Exchange of Dies at Assembly Line. ISSN 2231-7023
Full text not available from this repository.Metadata
Item Type: | Article |
---|---|
PRISMA ID: | 43817 |
URI: | http://oarr.uitm.edu.my/id/eprint/396 |