Home About Browse Policies Statistics

Minimizing Construction Impacts to the Surrounding, A Case Study: �Cadangan Membina dan Menyiapkan Bangunan Tambahan Pejabat Majlis Perbandaran Johor Bahru Tengah di atas Lot 1716 & 1717, Mukim Pulai, Daerah Johor Bahru, Johor Darul Takzim

(DR.), AMINUDDIN BIN MOHD BAKI (2005) Minimizing Construction Impacts to the Surrounding, A Case Study: �Cadangan Membina dan Menyiapkan Bangunan Tambahan Pejabat Majlis Perbandaran Johor Bahru Tengah di atas Lot 1716 & 1717, Mukim Pulai, Daerah Johor Bahru, Johor Darul Takzim.

Full text not available from this repository.

Metadata

Item Type: Article
PRISMA ID: 16692
URI: http://oarr.uitm.edu.my/id/eprint/546

Actions (login required)

View Item
View Item

Citation