Home About Browse Policies Statistics

Relationship between duration and cost of Malaysian construction projects

ENDUT, INTAN ROHANI BINTI (2008) Relationship between duration and cost of Malaysian construction projects. In: UNSPECIFIED UNSPECIFIED.

Full text not available from this repository.

Metadata

Item Type: Book Section
PRISMA ID: 17216
URI: http://oarr.uitm.edu.my/id/eprint/9485

Actions (login required)

View Item
View Item

Citation