Keutamaan kriteria pengurusan risiko dalam rantaian bekalan kilang kelapa sawit: pendekatan AHP

This study describes the seven components of the inherent risks that exist along the Palm Oil Plant (KMKS) supply chains, which are the Demand Risk (RP), Inventory Risk (RI), Supply Risk (RB), Environmental Risk (RS), Transportation Risk (RA), Delay Risk (RK) and Manpower Risk (RT), in which each ha...

Full description

Bibliographic Details
Main Author: Darwinah, Mohd Darwin Lim
Format: Thesis
Language:English
English
English
Published: 2016
Subjects:
Online Access:https://etd.uum.edu.my/6575/1/Depositpermission-s815105.pdf
https://etd.uum.edu.my/6575/2/s815105_01.pdf
https://etd.uum.edu.my/6575/3/s815105_02.pdf
https://etd.uum.edu.my/6575/
Abstract Abstract here