Relationship between refurbishment project complexity and energy efficiency design performance through the mediating design team attributes / Siti Nor Azniza Ahmad Sekak
There is a rising concern about energy consumption in buildings and its possible adverse impacts on the environment. This situation has made the existing building owners and designers to integrate Energy Efficiency (EE) design features into their refurbishment projects. However, the complexities of...
| Main Author: | Ahmad Sekak, Siti Nor Azniza |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2017
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/27841/2/27841.pdf |
Similar Items
The employment of foreign workers in maintenance industry / Nor Syizwani Jamawi
by: Jamawi, Nor Syizwani
Published: (2009)
by: Jamawi, Nor Syizwani
Published: (2009)
Investigation on robotic gas metal arc welding quality for specific ship panel structure / Mohammad Ridzwan Abdul Rahim
by: Abdul Rahim, Mohammad Ridzwan
Published: (2014)
by: Abdul Rahim, Mohammad Ridzwan
Published: (2014)
Faktor-faktor yang mempengaruhi nilai pasaran sewa rumah kedai dua tingkat di Shah Alam / Ramli Mohamed Amin
by: Mohamed Amin, Ramli
Published: (1996)
by: Mohamed Amin, Ramli
Published: (1996)
Maintenance management for construction plant / Mohd Hafiz Abd Khalib
by: Abd Khalib, Mohd Hafiz
Published: (2006)
by: Abd Khalib, Mohd Hafiz
Published: (2006)
Penggunaan buruh langsung dan tidak langsung dalam penyelenggaraan bangunan institut pendidikan tinggi awam dan swasta kajian dari aspek perancangan penggunaan buruh dalam perlaksanaan kerja penyelenggaraan / Rasli Sudin
by: Sudin, Rasli
Published: (1999)
by: Sudin, Rasli
Published: (1999)
Maintenance management of public building managed by Majlis Bandaraya Kuala Terengganu (MBKT) / Nor Zuraida Razali
by: Razali, Nor Zuraida
Published: (2009)
by: Razali, Nor Zuraida
Published: (2009)
Pentadbiran dan pengurusan pembinaan oleh kontraktor menurut perspektif Islam / Fadzleen Syaheeda Mohd Shukri
by: Mohd Shukri, Fadzleen Syaheeda
Published: (2002)
by: Mohd Shukri, Fadzleen Syaheeda
Published: (2002)
Effectiveness intelligent building in Malaysian construction industry / Sabariah Sareh Saad
by: Saad, Sabariah Sareh
Published: (2008)
by: Saad, Sabariah Sareh
Published: (2008)
Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar
by: Abu Bakar, Noor Kamisah
Published: (2001)
by: Abu Bakar, Noor Kamisah
Published: (2001)
Factors affecting health and safety performance in Kuching's construction project / Reelaiah Brum
by: Brum, Reelaiah
Published: (2020)
by: Brum, Reelaiah
Published: (2020)
Pengurusan bahan binaan di tapak bina / Rosdi Hassan
by: Hassan, Rosdi
Published: (2009)
by: Hassan, Rosdi
Published: (2009)
Maintenance management of convention centres / Norashikin Akhiar @ Khairuddin
by: Akhiar @ Khairuddin, Norashikin
Published: (2010)
by: Akhiar @ Khairuddin, Norashikin
Published: (2010)
Construction and maintenance of elevated highway in Klang Valley / Norfariz Syahmi Othman
by: Othman, Norfariz Syahmi
Published: (2009)
by: Othman, Norfariz Syahmi
Published: (2009)
A study on implementation of contract maintenance management at government sector / Norhashida Hassan
by: Hassan, Norhashida
Published: (2009)
by: Hassan, Norhashida
Published: (2009)
Maintenance management of local authority building (Majlis Bandaraya Melaka Bersejarah) / Nur Hidayu Zorkafli
by: Zorkafli, Nur Hidayu
Published: (2009)
by: Zorkafli, Nur Hidayu
Published: (2009)
Public toilet in Kuala Lumpur: the design layout and maintenance works / Zirwatul Isyqi Mazlan
by: Mazlan, Zirwatul Isyqi
Published: (2010)
by: Mazlan, Zirwatul Isyqi
Published: (2010)
The Adaptation of artificial intelligence in the malaysian construction industry / Mohammad Ashril Nadzim Abu Seman
by: Mohammad Ashril Nadzim, Abu Seman
Published: (2018)
by: Mohammad Ashril Nadzim, Abu Seman
Published: (2018)
Issues and challenges faced by quantity surveyors during final account preparation / Nur Khairina Khairul Hisham
by: Khairul Hisham, Nur Khairina
Published: (2020)
by: Khairul Hisham, Nur Khairina
Published: (2020)
Risk on design and build for construction project faced by developer / Muhammad Syakirin Ismail
by: Ismail, Muhammad Syakirin
Published: (2003)
by: Ismail, Muhammad Syakirin
Published: (2003)
Condition audit and maintenance for public building (Police Quarters) / Mohd Nor Rashidee Nora Afandi
by: Nora Afandi, Mohd Nor Rashidee
Published: (2010)
by: Nora Afandi, Mohd Nor Rashidee
Published: (2010)
Framework in remodelling new Malaysian Standard Method of Measurements (SMMs) / Anis Rosniza Nizam Akbar
by: Nizam Akbar, Anis Rosniza
Published: (2018)
by: Nizam Akbar, Anis Rosniza
Published: (2018)
Sistem pengurusan kualiti ISO 9002 di dalam syarikat pembinaan implementasi dan permasalahan / Mohd. Naim Abdul Jabar
by: Abdul Jabar, Mohd. Naim
Published: (1999)
by: Abdul Jabar, Mohd. Naim
Published: (1999)
Integration of Supply Chain Management (SCM) in Industrialised Building System (IBS) / Roland Royston Runggah Dunging
by: Dunging, Roland Royston Runggah
Published: (2020)
by: Dunging, Roland Royston Runggah
Published: (2020)
A comparison studies on financial implication in managing residential property (in-house vs. outsourcing) / Nur Atiqah Ab Rahman
by: Ab Rahman, Nur Atiqah
Published: (2010)
by: Ab Rahman, Nur Atiqah
Published: (2010)
Study on facilities in orphanage homes / Zati Nur Diyana Che Shopi
by: Che Shopi, Zati Nur Diyana
Published: (2010)
by: Che Shopi, Zati Nur Diyana
Published: (2010)
Effectiveness of operational on ice thermal energy storage system / Rudy Irawan Bakri
by: Bakri, Rudy Irawan
Published: (2003)
by: Bakri, Rudy Irawan
Published: (2003)
Rock blasting practices in Malaysian quarry industries / Muhammad Farhan Zulkifli
by: Zulkifli, Muhammad Farhan
Published: (2009)
by: Zulkifli, Muhammad Farhan
Published: (2009)
Implementation of lean construction in construction project towards safety improvement / Zalikha Morshidi
by: Morshidi, Zalikha
Published: (2020)
by: Morshidi, Zalikha
Published: (2020)
Characteristics of geomechanical properties of Sungai Buloh weathered granite / Nor Azniza Resali
by: Resali, Nor Azniza
Published: (2014)
by: Resali, Nor Azniza
Published: (2014)
The study of the implementation and the efectiveness of O.S.H.A on construction site (A case study on Putrajaya Construction Site) / Mohammad Mubarak Basir Ahmad
by: Basir Ahmad, Mohammad Mubarak
Published: (2002)
by: Basir Ahmad, Mohammad Mubarak
Published: (2002)
Conversion of residential housing to kindergarten in perspective to the local authority requirement / Nurul ‘Aiin Shahari
by: Shahari, Nurul ‘Aiin
Published: (2008)
by: Shahari, Nurul ‘Aiin
Published: (2008)
Health and safety in refurbishment projects involving demolition work
by: Rakhshanifar, Mansooreh
Published: (2013)
by: Rakhshanifar, Mansooreh
Published: (2013)
Refurbishment project management system for commercial highrise buildings in Malaysia
by: Seong, Pick Choong
Published: (2003)
by: Seong, Pick Choong
Published: (2003)
Critical success factors in workplace in relation with KPI in construction industry in Sarawak / Geraldine Emma Sinsoon
by: Sinsoon, Geraldine Emma
Published: (2020)
by: Sinsoon, Geraldine Emma
Published: (2020)
Materials management on refurbishment project in Klang Valley / Muhammad Helmyyuzi Mohd Hamid
by: Mohd Hamid, Muhammad Helmyyuzi
Published: (2015)
by: Mohd Hamid, Muhammad Helmyyuzi
Published: (2015)
Factors affecting time performance of refurbishment projects in Singapore / Chew Lee Fuan
by: Chew, Lee Fuan
Published: (2012)
by: Chew, Lee Fuan
Published: (2012)
A study on strategies of Sarawak Consolidated Industries Berhad (SCIB) to achieve competitive advantages in industrialised building system (IBS) industries in Kuching /
Abu Bakar Ahmat and Rosalina Suai
by: Ahmat, Abu Bakar, et al.
Published: (2014)
by: Ahmat, Abu Bakar, et al.
Published: (2014)
The effects of procurement systems toward performance of the refurbishment projects in Malaysia / Susie Chieng Ling
by: Susie, Chieng Ling
Published: (2012)
by: Susie, Chieng Ling
Published: (2012)
Impact of construction waste management towards environmental health / Mohamad Haziq Sulaiman
by: Sulaiman, Mohamad Haziq
Published: (2020)
by: Sulaiman, Mohamad Haziq
Published: (2020)
Determining waste generation factors in Klang Valley refurbishment projects / Chai Kok Liong
by: Chai, Kok Liong
Published: (2016)
by: Chai, Kok Liong
Published: (2016)
Similar Items
-
The employment of foreign workers in maintenance industry / Nor Syizwani Jamawi
by: Jamawi, Nor Syizwani
Published: (2009) -
Investigation on robotic gas metal arc welding quality for specific ship panel structure / Mohammad Ridzwan Abdul Rahim
by: Abdul Rahim, Mohammad Ridzwan
Published: (2014) -
Faktor-faktor yang mempengaruhi nilai pasaran sewa rumah kedai dua tingkat di Shah Alam / Ramli Mohamed Amin
by: Mohamed Amin, Ramli
Published: (1996) -
Maintenance management for construction plant / Mohd Hafiz Abd Khalib
by: Abd Khalib, Mohd Hafiz
Published: (2006) -
Penggunaan buruh langsung dan tidak langsung dalam penyelenggaraan bangunan institut pendidikan tinggi awam dan swasta kajian dari aspek perancangan penggunaan buruh dalam perlaksanaan kerja penyelenggaraan / Rasli Sudin
by: Sudin, Rasli
Published: (1999)