Flow simulation of icon city cable tunnel ventilation / Katheres Murugesu

The main concern in this project is the study and develop a ventilation system for Icon City Cable Tunnel. This is due to the fact the cables inside the tunnels generates heats as much as approximately 600C and these cables are laid in a 67.35-metre-length with 3 meter diameter tunnel. By using the...

وصف كامل

التفاصيل البيبلوغرافية
المؤلف الرئيسي: Katheres, Murugesu
التنسيق: أطروحة
منشور في: 2019
الموضوعات: