Two-stage Heuristic Method for Primary School Timetabling Problem with Considerations for Combined-classes

This research focuses on a primary school timetabling problem, a small-scale primary school that is located at Pengerang, Johor. In this small-scale primary school six classes have been allotted for standard one to standard six. Most of the primary schools timetable are manually developed, which is...

وصف كامل

التفاصيل البيبلوغرافية
المؤلف الرئيسي: Tan, See Yan
التنسيق: أطروحة
اللغة:الإنجليزية
منشور في: Universiti Malaysia Sarawak (UNIMAS) 2019
الموضوعات:
الوصول للمادة أونلاين:http://ir.unimas.my/id/eprint/27647/
Abstract Abstract here