Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks

The study of project control (cost control in particular) has only received limited attention in the Malaysian construction industry. The conventional project control system is basically corrective based, where project problems may have already occurred and the company may have experienced losses. A...

وصف كامل

التفاصيل البيبلوغرافية
المؤلف الرئيسي: Bahaudin, Ahmad Yusni
التنسيق: أطروحة
اللغة:الإنجليزية
منشور في: 2011
الموضوعات:
الوصول للمادة أونلاين:http://eprints.usm.my/43194/