Improvement of the SAG ampacity carrying level of existing 275 kV overhead line tower by using the re-conductoring approach
This project presents a methodological approach, suggestions and information in uprating the existing 275kV transmission overhead line by using the re-conductoring approach. Overhead transmission line conductors were given priority in information. Calculation regarding the maximum sag and maximum...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | English English English |
| Published: |
2012
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/2272/ |
| Abstract | Abstract here |