Improvement of the SAG ampacity carrying level of existing 275 kV overhead line tower by using the re-conductoring approach
This project presents a methodological approach, suggestions and information in uprating the existing 275kV transmission overhead line by using the re-conductoring approach. Overhead transmission line conductors were given priority in information. Calculation regarding the maximum sag and maximum...
| المؤلف الرئيسي: | |
|---|---|
| التنسيق: | Dissertation |
| اللغة: | الإنجليزية الإنجليزية الإنجليزية |
| منشور في: |
2012
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://eprints.uthm.edu.my/2272/ |
| Abstract | Abstract here |
