Bottleneck-based heuristic for three-machine flow shop scheduling

This paper considers a 3 machine flow shop (M1M2M3) with tendency of dominant (bottleneck) machine at M1. The developed bottleneck based heuristics from previous studies are considered in this case by Hezzeril (2010) and Irwan (2010), but were only tested for dominant machine at M2 and M3 respect...

Description complète

Détails bibliographiques
Auteur principal: Abdul Rahim, Mohd Salleh
Format: Thèse
Langue:anglais
anglais
anglais
Publié: 2011
Sujets:
Accès en ligne:http://eprints.uthm.edu.my/2724/
Abstract Abstract here