Bottleneck-based heuristic for three-machine flow shop scheduling

This paper considers a 3 machine flow shop (M1M2M3) with tendency of dominant (bottleneck) machine at M1. The developed bottleneck based heuristics from previous studies are considered in this case by Hezzeril (2010) and Irwan (2010), but were only tested for dominant machine at M2 and M3 respect...

詳細記述

書誌詳細
第一著者: Abdul Rahim, Mohd Salleh
フォーマット: Dissertation
言語:英語
英語
英語
出版事項: 2011
主題:
オンライン・アクセス:http://eprints.uthm.edu.my/2724/
Abstract Abstract here

類似資料