Selection of the industrialized building material supplier by analytic hierarchy process method
Industrialized Building system (IBS) aims to expedite the process of installation and construction at site. Industrialized Building System (IBS) is a construction system that is built using pre-fabricated components. The manufacturing of the components is systematically done using machine, formworks...
| المؤلف الرئيسي: | Moravveji, Mohammad Yousef |
|---|---|
| التنسيق: | أطروحة |
| اللغة: | الإنجليزية |
| منشور في: |
2013
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://eprints.utm.my/33277/1/MohammadYousefMoravvejiMFKA2013.pdf |
مواد مشابهة
Selection of the industrilized building material supplier by analytic hierarchy process method
حسب: Moravveji, Mohammad Yousef
منشور في: (2013)
حسب: Moravveji, Mohammad Yousef
منشور في: (2013)
Selection of material suppliers by the contractors in the construction industry
حسب: Ahankoob, Alireza
منشور في: (2013)
حسب: Ahankoob, Alireza
منشور في: (2013)
Assessing The Electronic Manufacturing Industry Suppliers Readiness Towards Green Technology Implementation
حسب: Samsudin, Mohd Nizam
منشور في: (2015)
حسب: Samsudin, Mohd Nizam
منشور في: (2015)
An Analytic Hierarchy Process Approach For Supplier Evaluation and Selection in a Steel Manufacturing Company
حسب: Tahriri, Farzad
منشور في: (2007)
حسب: Tahriri, Farzad
منشور في: (2007)
Development of an apparatus for the measurement of thermal conductivity of building materials
حسب: Kamsah, Nazri
منشور في: (1988)
حسب: Kamsah, Nazri
منشور في: (1988)
Reviewing the project delivery systems used in Malaysia Construction Industry : focus on the conventional method and the design and build method
حسب: Tee, Beng Hock
منشور في: (2000)
حسب: Tee, Beng Hock
منشور في: (2000)
Life cycle costing of industrialized building system and conventional building system
حسب: Ali Naji Al-Attabi, Ali Mohammed
منشور في: (2014)
حسب: Ali Naji Al-Attabi, Ali Mohammed
منشور في: (2014)
Simulation of assembly of components for industrialized building system
حسب: Ali Zoubi, Ali Houssein
منشور في: (2014)
حسب: Ali Zoubi, Ali Houssein
منشور في: (2014)
Accident prevention model for the building construction industry
حسب: Samuel, Williams Opeyemi
منشور في: (2019)
حسب: Samuel, Williams Opeyemi
منشور في: (2019)
Subcontractor selection method using analytic hierarchy process
حسب: Manoharan, Ravichandran
منشور في: (2005)
حسب: Manoharan, Ravichandran
منشور في: (2005)
Analysis of industrialized building system block work with ETABS
حسب: Rahmat, Maziar Ghabel
منشور في: (2013)
حسب: Rahmat, Maziar Ghabel
منشور في: (2013)
Reverse logistic for industrial building system construction project
حسب: Buniya, Mohanad Kamil
منشور في: (2014)
حسب: Buniya, Mohanad Kamil
منشور في: (2014)
Environmental Impact Of Predominant Building Materials Of Mosques In Mosul, Iraq From 1100s To 1800s Ad
حسب: Yahya, Hafedh Abed
منشور في: (2015)
حسب: Yahya, Hafedh Abed
منشور في: (2015)
Development of a social sustainability model in industrial building system
حسب: Taherkhani, Roohollah
منشور في: (2013)
حسب: Taherkhani, Roohollah
منشور في: (2013)
The implementation of design and build procurement approach in local construction industry
حسب: Pang, Sheh Haur
منشور في: (2004)
حسب: Pang, Sheh Haur
منشور في: (2004)
Economic comparison of industrialized building system with conventional system through cost estimation using building information modeling
حسب: Faghirinejadfard, Amir
منشور في: (2014)
حسب: Faghirinejadfard, Amir
منشور في: (2014)
The study of the effectiveness of design and build (D&B) procurement method in Malaysia
حسب: Yap, Jeffrey Boon Hui
منشور في: (2003)
حسب: Yap, Jeffrey Boon Hui
منشور في: (2003)
Fuzzy analytic hierarchy process approach for supplier development towards sustainable and responsive manufacturing
حسب: Tukimin, Rahayu
منشور في: (2023)
حسب: Tukimin, Rahayu
منشور في: (2023)
Supplier selection for solar photovoltaic (PV) module using analytical hierarchy process: Perlis Solar Plant Project
حسب: Zainurita, Mohamed Adnan
منشور في: (2016)
حسب: Zainurita, Mohamed Adnan
منشور في: (2016)
Safety considerations during the design process in construction industry
حسب: Hosseinian, Seyyed Shahab
منشور في: (2012)
حسب: Hosseinian, Seyyed Shahab
منشور في: (2012)
Building System Selection Framework For Energy Efficient Buildings
حسب: Wong, Say Keat
منشور في: (2017)
حسب: Wong, Say Keat
منشور في: (2017)
Control of materials on site
حسب: Chiew , Seng Khoon
منشور في: (2004)
حسب: Chiew , Seng Khoon
منشور في: (2004)
A multi-criteria generic process model for selecting fire protection system
حسب: Quah, Lee Hui
منشور في: (2012)
حسب: Quah, Lee Hui
منشور في: (2012)
Building Materials And Structural Foundations In The Bujang Valley And Comparisons With Four Regional Settlements
حسب: Singh, Meljev Singh Sidhu Sarjit
منشور في: (2018)
حسب: Singh, Meljev Singh Sidhu Sarjit
منشور في: (2018)
Ergonomics in building construction
حسب: Torghabeh, Zahra Jabbarani
منشور في: (2012)
حسب: Torghabeh, Zahra Jabbarani
منشور في: (2012)
Building performance assessment in terms of energy consumption using building information modeling
حسب: Shoubi, Mojtaba Valinejad
منشور في: (2013)
حسب: Shoubi, Mojtaba Valinejad
منشور في: (2013)
Facilities management of intelligent building : developing an application model in the management of intelligent building
حسب: Chua, Huwi Huwi
منشور في: (2001)
حسب: Chua, Huwi Huwi
منشور في: (2001)
A building information modelling based on contractual framework for construction of building projects
حسب: Abd Jamil, Ahmad Huzaimi
منشور في: (2020)
حسب: Abd Jamil, Ahmad Huzaimi
منشور في: (2020)
Characterization of space charge in the solid insulating materials
حسب: Mohd. Khalid, Mohd. Khairul
منشور في: (2014)
حسب: Mohd. Khalid, Mohd. Khairul
منشور في: (2014)
Comparing conventional to industrialised building system construction costing : a case study of school building projects
حسب: Abdul Aziz, Zuraidah
منشور في: (2012)
حسب: Abdul Aziz, Zuraidah
منشور في: (2012)
Computerised building cost estimating system
حسب: Marjuki, Mofti
منشور في: (2006)
حسب: Marjuki, Mofti
منشور في: (2006)
Disputes in design and build construction contract
حسب: Jasri, Siti Aishah Aqilah
منشور في: (2011)
حسب: Jasri, Siti Aishah Aqilah
منشور في: (2011)
Implementation's issues and problems commissioner of building
حسب: Ab Rahim, Ainul Rasyidah
منشور في: (2008)
حسب: Ab Rahim, Ainul Rasyidah
منشور في: (2008)
Measure of damages for defective building work
حسب: Wong, Bi Xia
منشور في: (2009)
حسب: Wong, Bi Xia
منشور في: (2009)
Variation orders in design and build contracts
حسب: Heng, Robert Wei Kiong
منشور في: (2009)
حسب: Heng, Robert Wei Kiong
منشور في: (2009)
Blast resistance of tall buildings structure
حسب: Sk. Abd. Razak, Sk. Muiz
منشور في: (2010)
حسب: Sk. Abd. Razak, Sk. Muiz
منشور في: (2010)
Feasibility for singular sustainable building indicator
حسب: Estahbanati, Seyed Reza Morsheidi
منشور في: (2014)
حسب: Estahbanati, Seyed Reza Morsheidi
منشور في: (2014)
Hidden Cost In Building Conservation Works
حسب: Wee, Li Woon
منشور في: (2011)
حسب: Wee, Li Woon
منشور في: (2011)
Software development for building energy analysis
حسب: Senawi, Mohd. Yusoff
منشور في: (1992)
حسب: Senawi, Mohd. Yusoff
منشور في: (1992)
Investigating The Purchase Intention Of House Buyers‟ In Choosing Between Sell Then Build (Stb) Or Build Then Sell (Bts) House
حسب: Jusoh, Mohd Hanafi
منشور في: (2015)
حسب: Jusoh, Mohd Hanafi
منشور في: (2015)
مواد مشابهة
-
Selection of the industrilized building material supplier by analytic hierarchy process method
حسب: Moravveji, Mohammad Yousef
منشور في: (2013) -
Selection of material suppliers by the contractors in the construction industry
حسب: Ahankoob, Alireza
منشور في: (2013) -
Assessing The Electronic Manufacturing Industry Suppliers Readiness Towards Green Technology Implementation
حسب: Samsudin, Mohd Nizam
منشور في: (2015) -
An Analytic Hierarchy Process Approach For Supplier Evaluation and Selection in a Steel Manufacturing Company
حسب: Tahriri, Farzad
منشور في: (2007) -
Development of an apparatus for the measurement of thermal conductivity of building materials
حسب: Kamsah, Nazri
منشور في: (1988)