The effectiveness of various structural system in reducing tall building response due to wind
Recently, many tall building structural systems have been innovated in order to reduce the building responses due to wind loading. However, there are no systematic study conducted on the effectiveness of the different tall building systems in minimizing the responses of the building due to wind load...
| المؤلف الرئيسي: | Abd. Samat, Roslida |
|---|---|
| التنسيق: | أطروحة |
| اللغة: | الإنجليزية |
| منشور في: |
2008
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://eprints.utm.my/36175/1/RoslidaAbdSamatPFKA2008.pdf |
مواد مشابهة
The effectiveness of various structural systems in reducing tall building response due to wind
حسب: Abd. Samat, Roslida
منشور في: (2008)
حسب: Abd. Samat, Roslida
منشور في: (2008)
Blast resistance of tall buildings structure
حسب: Sk. Abd. Razak, Sk. Muiz
منشور في: (2010)
حسب: Sk. Abd. Razak, Sk. Muiz
منشور في: (2010)
Interconnecting outriggers system in tall building structure
حسب: Nasr, Ali Hadian
منشور في: (2014)
حسب: Nasr, Ali Hadian
منشور في: (2014)
Wind effects on symmetrical multiple core wall system of high-rise building
حسب: Samsudin, Hazwani
منشور في: (2014)
حسب: Samsudin, Hazwani
منشور في: (2014)
Challenges in coordination process for tall building construction
حسب: Mohd. Noor, Mohd. Nasir
منشور في: (2010)
حسب: Mohd. Noor, Mohd. Nasir
منشور في: (2010)
Modern and innovative structural systems : behaviour of framed buildings
حسب: H. Alrawi, Fatin Faris
منشور في: (1998)
حسب: H. Alrawi, Fatin Faris
منشور في: (1998)
Diminution in value of works due to deffects
حسب: Hashim, Norhaibati
منشور في: (2011)
حسب: Hashim, Norhaibati
منشور في: (2011)
Claims for additional preliminaries costs due to project prolongation
حسب: Saidin, Aminuddin
منشور في: (2015)
حسب: Saidin, Aminuddin
منشور في: (2015)
Can the contract be renegotiated due to covid-19 pandemic?
حسب: Wong, Kenvy Chee Vui
منشور في: (2022)
حسب: Wong, Kenvy Chee Vui
منشور في: (2022)
The implication of express provision for termination of contract due to nonpayment by employer
حسب: Adamu, Samaila
منشور في: (2010)
حسب: Adamu, Samaila
منشور في: (2010)
Recovery of interest / financing charges due to prolongation in construction contract
حسب: Ng, Chee Kuang
منشور في: (2010)
حسب: Ng, Chee Kuang
منشور في: (2010)
Employer's recovery of payment caused variations due to designers negligence
حسب: Yusoff, Zaharah
منشور في: (2009)
حسب: Yusoff, Zaharah
منشور في: (2009)
Predicting Insulation And Structural Response Of Foamed Concrete Panel
حسب: Ganesan, Shankar
منشور في: (2015)
حسب: Ganesan, Shankar
منشور في: (2015)
The Performance Of Wind
Wing-Wall On Air Velocity For High-Rise
Residential Building In Malaysia
حسب: Rosdi, Munirah
منشور في: (2018)
حسب: Rosdi, Munirah
منشور في: (2018)
Life cycle costing of industrialized building system and conventional building system
حسب: Ali Naji Al-Attabi, Ali Mohammed
منشور في: (2014)
حسب: Ali Naji Al-Attabi, Ali Mohammed
منشور في: (2014)
Frustration of contract due to abnormal increase of price in Malaysia legal perspective
حسب: Zulkifli, Siti Salwa Ashikin
منشور في: (2016)
حسب: Zulkifli, Siti Salwa Ashikin
منشور في: (2016)
Effectiveness Of Peltier Cooling
Device In Reducing The Air
Temperature Of Rooms In Buildings
حسب: Seifi, Molood
منشور في: (2013)
حسب: Seifi, Molood
منشور في: (2013)
Petition for winding up under section 218 of Companies Act 1965
حسب: Tiew, Syen Youngs
منشور في: (2012)
حسب: Tiew, Syen Youngs
منشور في: (2012)
Dynamic response prediction of steel frame structure considering semi rigid connection
حسب: Sondossi, Soroush
منشور في: (2013)
حسب: Sondossi, Soroush
منشور في: (2013)
Computerised building cost estimating system
حسب: Marjuki, Mofti
منشور في: (2006)
حسب: Marjuki, Mofti
منشور في: (2006)
Economic comparison of industrialized building system with conventional system through cost estimation using building information modeling
حسب: Faghirinejadfard, Amir
منشور في: (2014)
حسب: Faghirinejadfard, Amir
منشور في: (2014)
Project Success factors for design-build system
حسب: Ab. Wahab, Mohd. Saupi
منشور في: (2004)
حسب: Ab. Wahab, Mohd. Saupi
منشور في: (2004)
Simulation of assembly of components for industrialized building system
حسب: Ali Zoubi, Ali Houssein
منشور في: (2014)
حسب: Ali Zoubi, Ali Houssein
منشور في: (2014)
A building information modelling based on contractual framework for construction of building projects
حسب: Abd Jamil, Ahmad Huzaimi
منشور في: (2020)
حسب: Abd Jamil, Ahmad Huzaimi
منشور في: (2020)
Comparing conventional to industrialised building system construction costing : a case study of school building projects
حسب: Abdul Aziz, Zuraidah
منشور في: (2012)
حسب: Abdul Aziz, Zuraidah
منشور في: (2012)
Air-conditioning system with simultaneous control of sensible and latent heat for building energy conservation in Malaysia
حسب: Azizuddin, Abd Aziz
منشور في: (2014)
حسب: Azizuddin, Abd Aziz
منشور في: (2014)
Framework to reduce variation processing time in public projects
حسب: Abdul Kadir, Munirah
منشور في: (2018)
حسب: Abdul Kadir, Munirah
منشور في: (2018)
Analysis of industrialized building system block work with ETABS
حسب: Rahmat, Maziar Ghabel
منشور في: (2013)
حسب: Rahmat, Maziar Ghabel
منشور في: (2013)
Reverse logistic for industrial building system construction project
حسب: Buniya, Mohanad Kamil
منشور في: (2014)
حسب: Buniya, Mohanad Kamil
منشور في: (2014)
Development of a social sustainability model in industrial building system
حسب: Taherkhani, Roohollah
منشور في: (2013)
حسب: Taherkhani, Roohollah
منشور في: (2013)
Executive information system for monitoring building construction work progress
حسب: Zakaria, Wan Zahran
منشور في: (2013)
حسب: Zakaria, Wan Zahran
منشور في: (2013)
The requirement for implementation of open building system in terrace houses in Malaysia
حسب: Amin, Rasoulijavaheri
منشور في: (2013)
حسب: Amin, Rasoulijavaheri
منشور في: (2013)
Persepsi pemaju terhadap penggunaan IBS (Industrialised Building System)
حسب: Ab. Rahim, Nor Hayati
منشور في: (2009)
حسب: Ab. Rahim, Nor Hayati
منشور في: (2009)
Refurbishment project management system for commercial highrise buildings in Malaysia
حسب: Seong, Pick Choong
منشور في: (2003)
حسب: Seong, Pick Choong
منشور في: (2003)
Outrigger system for interconnecting three dimensional multi-stories buildings
حسب: Teck Shin, Lee
منشور في: (2014)
حسب: Teck Shin, Lee
منشور في: (2014)
Outrigger system for interconnecting three dimensional multi-stories buildings
حسب: Lee, Teck Shin
منشور في: (2014)
حسب: Lee, Teck Shin
منشور في: (2014)
An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
حسب: Mansor, Lydiana
منشور في: (2022)
حسب: Mansor, Lydiana
منشور في: (2022)
Client perspective towards application of industrialised building system in private construction projetcs
حسب: Suraji, Norlia Sofa
منشور في: (2013)
حسب: Suraji, Norlia Sofa
منشور في: (2013)
Ergonomics in building construction
حسب: Torghabeh, Zahra Jabbarani
منشور في: (2012)
حسب: Torghabeh, Zahra Jabbarani
منشور في: (2012)
Building performance assessment in terms of energy consumption using building information modeling
حسب: Shoubi, Mojtaba Valinejad
منشور في: (2013)
حسب: Shoubi, Mojtaba Valinejad
منشور في: (2013)
مواد مشابهة
-
The effectiveness of various structural systems in reducing tall building response due to wind
حسب: Abd. Samat, Roslida
منشور في: (2008) -
Blast resistance of tall buildings structure
حسب: Sk. Abd. Razak, Sk. Muiz
منشور في: (2010) -
Interconnecting outriggers system in tall building structure
حسب: Nasr, Ali Hadian
منشور في: (2014) -
Wind effects on symmetrical multiple core wall system of high-rise building
حسب: Samsudin, Hazwani
منشور في: (2014) -
Challenges in coordination process for tall building construction
حسب: Mohd. Noor, Mohd. Nasir
منشور في: (2010)