Status of estimates for emergency work
In a normal prosedur, estimate is made based on drawings to predict the cost of a project for tender analysis purposes. However, in emergency works, such as land slides that disrupt public facilities, the normal procedure is inappropriate because of its time consuming process. Thus, the Malaysian Tr...
| 主要作者: | Maidin, Noraini |
|---|---|
| 格式: | Thesis |
| 出版: |
2010
|
| 主題: |
相似書籍
Disaster And Emergency Planning And
Preparedness In The Jordanian Hotel
Industry
由: Suleiman Albattat, Ahmad Rasmi
出版: (2016)
由: Suleiman Albattat, Ahmad Rasmi
出版: (2016)
Estimate in formation of construction contract
由: Ahmad Termizi, Ezatul Sharida
出版: (2013)
由: Ahmad Termizi, Ezatul Sharida
出版: (2013)
Computerised building cost estimating system
由: Marjuki, Mofti
出版: (2006)
由: Marjuki, Mofti
出版: (2006)
The Influence Of Uncertainty Variables On
Project Cost Estimation
由: Rauzana, Anita
出版: (2015)
由: Rauzana, Anita
出版: (2015)
Application of BIM in early stage design cost estimation
由: Maskuriy, Raihan
出版: (2014)
由: Maskuriy, Raihan
出版: (2014)
An evaluation of effectiveness of approximate quantity method in estimating construction cost
由: Siew, Sik Nguong
出版: (2013)
由: Siew, Sik Nguong
出版: (2013)
Assessment and modification of daylight prediction and estimation tools for Malaysian practice
由: Denan, Zuraini
出版: (1999)
由: Denan, Zuraini
出版: (1999)
Analysis of factors affecting the accuracy of early cost estimate in construction projects
由: Woyowarsito, Dodi Ardianto
出版: (2011)
由: Woyowarsito, Dodi Ardianto
出版: (2011)
Termination of contract : abandonment of work
由: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
出版: (2012)
由: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
出版: (2012)
Diminution in value of works due to deffects
由: Hashim, Norhaibati
出版: (2011)
由: Hashim, Norhaibati
出版: (2011)
Measure of damages for defective building work
由: Wong, Bi Xia
出版: (2009)
由: Wong, Bi Xia
出版: (2009)
Hidden Cost In Building Conservation Works
由: Wee, Li Woon
出版: (2011)
由: Wee, Li Woon
出版: (2011)
Factors affecting the preparation of the construction work programme
由: Mohamad, Mardiana
出版: (2016)
由: Mohamad, Mardiana
出版: (2016)
Problems associated with acceleration works and its solutions
由: Mohamad Nazir, Noor Jannah
出版: (2016)
由: Mohamad Nazir, Noor Jannah
出版: (2016)
Health and safety in refurbishment projects involving demolition work
由: Rakhshanifar, Mansooreh
出版: (2013)
由: Rakhshanifar, Mansooreh
出版: (2013)
Analysis of industrialized building system block work with ETABS
由: Rahmat, Maziar Ghabel
出版: (2013)
由: Rahmat, Maziar Ghabel
出版: (2013)
The prevailing practice in deciding the practical completion of construction work
由: Mohd. Yunos, Mohammad Harith
出版: (2015)
由: Mohd. Yunos, Mohammad Harith
出版: (2015)
Termination procedures of projects by the public works department (PWD)
由: Sanusi, Intan Safina
出版: (2015)
由: Sanusi, Intan Safina
出版: (2015)
Economic comparison of industrialized building system with conventional system through cost estimation using building information modeling
由: Faghirinejadfard, Amir
出版: (2014)
由: Faghirinejadfard, Amir
出版: (2014)
Executive information system for monitoring building construction work progress
由: Zakaria, Wan Zahran
出版: (2013)
由: Zakaria, Wan Zahran
出版: (2013)
Management of variation order in Public Work Department Malaysia construction project
由: Amir Mohamed, Sharil Amran
出版: (2013)
由: Amir Mohamed, Sharil Amran
出版: (2013)
Evaluation on current practice in work breakdown structure approach for construction schedules
由: Md. Isha, Mohd. Nasir
出版: (2004)
由: Md. Isha, Mohd. Nasir
出版: (2004)
Tree species composition and configuration based on squirrel behaviour pattern in selected Malaysian urban parks
由: Bahari, Noraini
出版: (2019)
由: Bahari, Noraini
出版: (2019)
Contractor's liability relating to defective works that are discovered after the defects liability period
由: Leong, Mei Wan
出版: (2010)
由: Leong, Mei Wan
出版: (2010)
Contractor's liabilities towards employer's defective building work claims during defect liability period
由: Lim, Tze Shwan
出版: (2011)
由: Lim, Tze Shwan
出版: (2011)
The cost overruns in green building development : case study Ministry of Public Works new green building project Republic of Indonesia
由: Putro, Anggoro
出版: (2012)
由: Putro, Anggoro
出版: (2012)
An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
由: Mansor, Lydiana
出版: (2022)
由: Mansor, Lydiana
出版: (2022)
Prevalent Tender Preparation Practices For Building Conservation Works
由: Lee , Qin Yin
出版: (2009)
由: Lee , Qin Yin
出版: (2009)
The Integration Of Maintenance Requirement Into Development Plan Of Work For Government Building
由: Khalid, Ellemy Iskandar
出版: (2017)
由: Khalid, Ellemy Iskandar
出版: (2017)
The Daylight And Luminous Environment Of Working Area In Library Of University Malaya
由: Mortazaee, Sahar
出版: (2021)
由: Mortazaee, Sahar
出版: (2021)
The effect of the Control of Rent (Repeal) Act 1997 on the rental level of commercial properties in Georgetown
由: Johari, Noraini
出版: (2003)
由: Johari, Noraini
出版: (2003)
Advanced e-presentation system of a work plan for improved project communication
由: Vendra, Venkata Krishna
出版: (2007)
由: Vendra, Venkata Krishna
出版: (2007)
Accessibility For Working Women In An Urban Environment: Case Study Of The Komtar Mixed-Use Development Area In Penang
由: Yeong , Yoong Chia
出版: (2006)
由: Yeong , Yoong Chia
出版: (2006)
Pembangunan Progresif Bandar Dan Kesan Ke Atas Prestasi Perniagaan - Bandar Balik Pulau
由: Md. Zain, Noraini
出版: (2003)
由: Md. Zain, Noraini
出版: (2003)
Contractor's liability to third party for defective works
由: Mohmad Zainordi, Zainab
出版: (2006)
由: Mohmad Zainordi, Zainab
出版: (2006)
Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker
由: Tan, Swee Kok
出版: (2010)
由: Tan, Swee Kok
出版: (2010)
Integrating green initiatives into existing commerical buildings
由: Cheng, Yew Leong
出版: (2010)
由: Cheng, Yew Leong
出版: (2010)
Contracting out of statutory provision in Malaysian construction contract
由: Lee, Sze Yin
出版: (2010)
由: Lee, Sze Yin
出版: (2010)
Employer's right of set-off in construction contracts
由: Chin, Kean Voon
出版: (2010)
由: Chin, Kean Voon
出版: (2010)
Standard of proof on fraud in civil proceedings and voidable construction contract
由: Hamzah, Azman
出版: (2010)
由: Hamzah, Azman
出版: (2010)
相似書籍
-
Disaster And Emergency Planning And
Preparedness In The Jordanian Hotel
Industry
由: Suleiman Albattat, Ahmad Rasmi
出版: (2016) -
Estimate in formation of construction contract
由: Ahmad Termizi, Ezatul Sharida
出版: (2013) -
Computerised building cost estimating system
由: Marjuki, Mofti
出版: (2006) -
The Influence Of Uncertainty Variables On
Project Cost Estimation
由: Rauzana, Anita
出版: (2015) -
Application of BIM in early stage design cost estimation
由: Maskuriy, Raihan
出版: (2014)