Status of estimates for emergency work
In a normal prosedur, estimate is made based on drawings to predict the cost of a project for tender analysis purposes. However, in emergency works, such as land slides that disrupt public facilities, the normal procedure is inappropriate because of its time consuming process. Thus, the Malaysian Tr...
| मुख्य लेखक: | Maidin, Noraini |
|---|---|
| स्वरूप: | थीसिस |
| प्रकाशित: |
2010
|
| विषय: |
समान संसाधन
Disaster And Emergency Planning And
Preparedness In The Jordanian Hotel
Industry
द्वारा: Suleiman Albattat, Ahmad Rasmi
प्रकाशित: (2016)
द्वारा: Suleiman Albattat, Ahmad Rasmi
प्रकाशित: (2016)
Estimate in formation of construction contract
द्वारा: Ahmad Termizi, Ezatul Sharida
प्रकाशित: (2013)
द्वारा: Ahmad Termizi, Ezatul Sharida
प्रकाशित: (2013)
Computerised building cost estimating system
द्वारा: Marjuki, Mofti
प्रकाशित: (2006)
द्वारा: Marjuki, Mofti
प्रकाशित: (2006)
The Influence Of Uncertainty Variables On
Project Cost Estimation
द्वारा: Rauzana, Anita
प्रकाशित: (2015)
द्वारा: Rauzana, Anita
प्रकाशित: (2015)
Application of BIM in early stage design cost estimation
द्वारा: Maskuriy, Raihan
प्रकाशित: (2014)
द्वारा: Maskuriy, Raihan
प्रकाशित: (2014)
An evaluation of effectiveness of approximate quantity method in estimating construction cost
द्वारा: Siew, Sik Nguong
प्रकाशित: (2013)
द्वारा: Siew, Sik Nguong
प्रकाशित: (2013)
Assessment and modification of daylight prediction and estimation tools for Malaysian practice
द्वारा: Denan, Zuraini
प्रकाशित: (1999)
द्वारा: Denan, Zuraini
प्रकाशित: (1999)
Analysis of factors affecting the accuracy of early cost estimate in construction projects
द्वारा: Woyowarsito, Dodi Ardianto
प्रकाशित: (2011)
द्वारा: Woyowarsito, Dodi Ardianto
प्रकाशित: (2011)
Termination of contract : abandonment of work
द्वारा: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
प्रकाशित: (2012)
द्वारा: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
प्रकाशित: (2012)
Diminution in value of works due to deffects
द्वारा: Hashim, Norhaibati
प्रकाशित: (2011)
द्वारा: Hashim, Norhaibati
प्रकाशित: (2011)
Measure of damages for defective building work
द्वारा: Wong, Bi Xia
प्रकाशित: (2009)
द्वारा: Wong, Bi Xia
प्रकाशित: (2009)
Hidden Cost In Building Conservation Works
द्वारा: Wee, Li Woon
प्रकाशित: (2011)
द्वारा: Wee, Li Woon
प्रकाशित: (2011)
Factors affecting the preparation of the construction work programme
द्वारा: Mohamad, Mardiana
प्रकाशित: (2016)
द्वारा: Mohamad, Mardiana
प्रकाशित: (2016)
Problems associated with acceleration works and its solutions
द्वारा: Mohamad Nazir, Noor Jannah
प्रकाशित: (2016)
द्वारा: Mohamad Nazir, Noor Jannah
प्रकाशित: (2016)
Health and safety in refurbishment projects involving demolition work
द्वारा: Rakhshanifar, Mansooreh
प्रकाशित: (2013)
द्वारा: Rakhshanifar, Mansooreh
प्रकाशित: (2013)
Analysis of industrialized building system block work with ETABS
द्वारा: Rahmat, Maziar Ghabel
प्रकाशित: (2013)
द्वारा: Rahmat, Maziar Ghabel
प्रकाशित: (2013)
The prevailing practice in deciding the practical completion of construction work
द्वारा: Mohd. Yunos, Mohammad Harith
प्रकाशित: (2015)
द्वारा: Mohd. Yunos, Mohammad Harith
प्रकाशित: (2015)
Termination procedures of projects by the public works department (PWD)
द्वारा: Sanusi, Intan Safina
प्रकाशित: (2015)
द्वारा: Sanusi, Intan Safina
प्रकाशित: (2015)
Economic comparison of industrialized building system with conventional system through cost estimation using building information modeling
द्वारा: Faghirinejadfard, Amir
प्रकाशित: (2014)
द्वारा: Faghirinejadfard, Amir
प्रकाशित: (2014)
Executive information system for monitoring building construction work progress
द्वारा: Zakaria, Wan Zahran
प्रकाशित: (2013)
द्वारा: Zakaria, Wan Zahran
प्रकाशित: (2013)
Management of variation order in Public Work Department Malaysia construction project
द्वारा: Amir Mohamed, Sharil Amran
प्रकाशित: (2013)
द्वारा: Amir Mohamed, Sharil Amran
प्रकाशित: (2013)
Evaluation on current practice in work breakdown structure approach for construction schedules
द्वारा: Md. Isha, Mohd. Nasir
प्रकाशित: (2004)
द्वारा: Md. Isha, Mohd. Nasir
प्रकाशित: (2004)
Tree species composition and configuration based on squirrel behaviour pattern in selected Malaysian urban parks
द्वारा: Bahari, Noraini
प्रकाशित: (2019)
द्वारा: Bahari, Noraini
प्रकाशित: (2019)
Contractor's liability relating to defective works that are discovered after the defects liability period
द्वारा: Leong, Mei Wan
प्रकाशित: (2010)
द्वारा: Leong, Mei Wan
प्रकाशित: (2010)
Contractor's liabilities towards employer's defective building work claims during defect liability period
द्वारा: Lim, Tze Shwan
प्रकाशित: (2011)
द्वारा: Lim, Tze Shwan
प्रकाशित: (2011)
The cost overruns in green building development : case study Ministry of Public Works new green building project Republic of Indonesia
द्वारा: Putro, Anggoro
प्रकाशित: (2012)
द्वारा: Putro, Anggoro
प्रकाशित: (2012)
An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
द्वारा: Mansor, Lydiana
प्रकाशित: (2022)
द्वारा: Mansor, Lydiana
प्रकाशित: (2022)
Prevalent Tender Preparation Practices For Building Conservation Works
द्वारा: Lee , Qin Yin
प्रकाशित: (2009)
द्वारा: Lee , Qin Yin
प्रकाशित: (2009)
The Integration Of Maintenance Requirement Into Development Plan Of Work For Government Building
द्वारा: Khalid, Ellemy Iskandar
प्रकाशित: (2017)
द्वारा: Khalid, Ellemy Iskandar
प्रकाशित: (2017)
The Daylight And Luminous Environment Of Working Area In Library Of University Malaya
द्वारा: Mortazaee, Sahar
प्रकाशित: (2021)
द्वारा: Mortazaee, Sahar
प्रकाशित: (2021)
The effect of the Control of Rent (Repeal) Act 1997 on the rental level of commercial properties in Georgetown
द्वारा: Johari, Noraini
प्रकाशित: (2003)
द्वारा: Johari, Noraini
प्रकाशित: (2003)
Advanced e-presentation system of a work plan for improved project communication
द्वारा: Vendra, Venkata Krishna
प्रकाशित: (2007)
द्वारा: Vendra, Venkata Krishna
प्रकाशित: (2007)
Accessibility For Working Women In An Urban Environment: Case Study Of The Komtar Mixed-Use Development Area In Penang
द्वारा: Yeong , Yoong Chia
प्रकाशित: (2006)
द्वारा: Yeong , Yoong Chia
प्रकाशित: (2006)
Pembangunan Progresif Bandar Dan Kesan Ke Atas Prestasi Perniagaan - Bandar Balik Pulau
द्वारा: Md. Zain, Noraini
प्रकाशित: (2003)
द्वारा: Md. Zain, Noraini
प्रकाशित: (2003)
Contractor's liability to third party for defective works
द्वारा: Mohmad Zainordi, Zainab
प्रकाशित: (2006)
द्वारा: Mohmad Zainordi, Zainab
प्रकाशित: (2006)
Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker
द्वारा: Tan, Swee Kok
प्रकाशित: (2010)
द्वारा: Tan, Swee Kok
प्रकाशित: (2010)
Integrating green initiatives into existing commerical buildings
द्वारा: Cheng, Yew Leong
प्रकाशित: (2010)
द्वारा: Cheng, Yew Leong
प्रकाशित: (2010)
Contracting out of statutory provision in Malaysian construction contract
द्वारा: Lee, Sze Yin
प्रकाशित: (2010)
द्वारा: Lee, Sze Yin
प्रकाशित: (2010)
Employer's right of set-off in construction contracts
द्वारा: Chin, Kean Voon
प्रकाशित: (2010)
द्वारा: Chin, Kean Voon
प्रकाशित: (2010)
Standard of proof on fraud in civil proceedings and voidable construction contract
द्वारा: Hamzah, Azman
प्रकाशित: (2010)
द्वारा: Hamzah, Azman
प्रकाशित: (2010)
समान संसाधन
-
Disaster And Emergency Planning And
Preparedness In The Jordanian Hotel
Industry
द्वारा: Suleiman Albattat, Ahmad Rasmi
प्रकाशित: (2016) -
Estimate in formation of construction contract
द्वारा: Ahmad Termizi, Ezatul Sharida
प्रकाशित: (2013) -
Computerised building cost estimating system
द्वारा: Marjuki, Mofti
प्रकाशित: (2006) -
The Influence Of Uncertainty Variables On
Project Cost Estimation
द्वारा: Rauzana, Anita
प्रकाशित: (2015) -
Application of BIM in early stage design cost estimation
द्वारा: Maskuriy, Raihan
प्रकाशित: (2014)