Predicting the performance of design-bid-build projects: a neural-network based approach
Several studies had shown that many project managers are facing difficulties in predicting the performance of Design- bid-build (DBB) projects. This is due to the fact that there are many factors that affect DBB project success. This research is carried out to identify these factors. In addition, a...
| المؤلف الرئيسي: | Tan, Caren Cai Loon |
|---|---|
| التنسيق: | أطروحة |
| اللغة: | الإنجليزية |
| منشور في: |
2006
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://eprints.utm.my/3837/1/TanCaiLoonMFKA2006.pdf |
مواد مشابهة
Construction bid model for residential building projects in Dubai
حسب: Al Janabi, Tamadhur H. F.
منشور في: (2018)
حسب: Al Janabi, Tamadhur H. F.
منشور في: (2018)
Selection factor to bid or not to bid for extra low voltage system (ELV) project
حسب: Khairul Anuar, Mohamad Amir Syafiq
منشور في: (2019)
حسب: Khairul Anuar, Mohamad Amir Syafiq
منشور في: (2019)
Tunneling-induced ground movement and building damage prediction using hybrid artificial neural networks
حسب: Hajihassani, Mohsen
منشور في: (2013)
حسب: Hajihassani, Mohsen
منشور في: (2013)
Procurement methods and contractor's bidding strategy in Middle East construction industry
حسب: Amirsoleimani, Omidreza
منشور في: (2014)
حسب: Amirsoleimani, Omidreza
منشور في: (2014)
Risk management of design and build project
حسب: Amat Bakri, Nurul Khalida
منشور في: (2019)
حسب: Amat Bakri, Nurul Khalida
منشور في: (2019)
The application of artificial neural network in seismic evaluation of buildings
حسب: Ismail, Rozaina
منشور في: (2008)
حسب: Ismail, Rozaina
منشور في: (2008)
Achieving integrated project design using building information modeling (BIM)
حسب: Tan, Mei Ying
منشور في: (2012)
حسب: Tan, Mei Ying
منشور في: (2012)
Implementation of ISO 9001:2000 quality management system for construction biddings procedures in construction management practice
حسب: Youceff, Berreksi
منشور في: (2006)
حسب: Youceff, Berreksi
منشور في: (2006)
Design Of Normal Concrete Mixes Using Neural Network Model
حسب: Mohd Dzulkonnain, Abu Bakar
منشور في: (2000)
حسب: Mohd Dzulkonnain, Abu Bakar
منشور في: (2000)
Passive design approach towards energy efficient building envelope for individual residential
حسب: Ahmad Shah, Fathihah
منشور في: (2015)
حسب: Ahmad Shah, Fathihah
منشور في: (2015)
Productivity rate for industrialised building system project
حسب: Raja Abd. Assis, Raja Puteri Marlina
منشور في: (2020)
حسب: Raja Abd. Assis, Raja Puteri Marlina
منشور في: (2020)
Developing a model to predict time delay in road construction projects using bayesian networks
حسب: Mohammad, Almohammad
منشور في: (2020)
حسب: Mohammad, Almohammad
منشور في: (2020)
A compressive concrete strength prediction model using artificial neural networks
حسب: Guoji, Zang
منشور في: (2017)
حسب: Guoji, Zang
منشور في: (2017)
Risk assessment tool for implementing building information modelling in industrialised building system project
حسب: Tabatabaee, Sanaz
منشور في: (2019)
حسب: Tabatabaee, Sanaz
منشور في: (2019)
Green building features and construction cost in housing project
حسب: Yong, Priscilla Chang Hua
منشور في: (2020)
حسب: Yong, Priscilla Chang Hua
منشور في: (2020)
Advantages and effectiveness of project implementation through nominated sub-contractor in JKR building construction project
حسب: Zainal Abidin, Muhd. Nor Ridhwan
منشور في: (2018)
حسب: Zainal Abidin, Muhd. Nor Ridhwan
منشور في: (2018)
Pm10 Concentrations Short Term Prediction
Using Regression, Artificial Neural Network And Hybrid Models
حسب: Japeri, Ahmad Zia Ul-Saufie Mohamad
منشور في: (2013)
حسب: Japeri, Ahmad Zia Ul-Saufie Mohamad
منشور في: (2013)
Projection and prediction of heat waves for an arid region in the context of climate change
حسب: Ullah Khan, Najeeb
منشور في: (2020)
حسب: Ullah Khan, Najeeb
منشور في: (2020)
The implementation of design and build procurement approach in local construction industry
حسب: Pang, Sheh Haur
منشور في: (2003)
حسب: Pang, Sheh Haur
منشور في: (2003)
Relationship model of constructability and cost performance for Indonesia state building project
حسب: Sumarno, Pito
منشور في: (2020)
حسب: Sumarno, Pito
منشور في: (2020)
A novel decision support tool for assessing the suitability of design-build method for civil construction projects in Malaysia
حسب: Lee, Zheng Ping
منشور في: (2022)
حسب: Lee, Zheng Ping
منشور في: (2022)
Multistage artificial neural network in structural damage detection
حسب: Goh, Lyn Dee
منشور في: (2015)
حسب: Goh, Lyn Dee
منشور في: (2015)
Client perspective towards application of industrialised building system in private construction projects
حسب: Suraji, Norlia Sofa
منشور في: (2013)
حسب: Suraji, Norlia Sofa
منشور في: (2013)
Conceptual framework of key performance indicator for industralised building system project in Malaysia
حسب: Yan, Kim Leong
منشور في: (2017)
حسب: Yan, Kim Leong
منشور في: (2017)
A machine learning-based framework for delay risk mitigation in building projects
حسب: Sanni-Anibire, Muizz Oladapo
منشور في: (2021)
حسب: Sanni-Anibire, Muizz Oladapo
منشور في: (2021)
Method for determining optimum rain gauge network in a tropical urban catchment
حسب: Goh, Yee Cai
منشور في: (2011)
حسب: Goh, Yee Cai
منشور في: (2011)
Design optimization for energy consumption in residential buildings through building information modeling
حسب: Hassanabadi, Mahmoud Shakouri
منشور في: (2012)
حسب: Hassanabadi, Mahmoud Shakouri
منشور في: (2012)
Developing the prediction model for mitigating the abandoned housing projects in malaysia
حسب: Saidah An’nisaa, Salam
منشور في: (2023)
حسب: Saidah An’nisaa, Salam
منشور في: (2023)
Quantitative risk allocation approach in public-private partnership projects
حسب: Valipour, Alireza
منشور في: (2015)
حسب: Valipour, Alireza
منشور في: (2015)
Vibration based damage detection using artificial neural network
حسب: Low, Tian Hock
منشور في: (2010)
حسب: Low, Tian Hock
منشور في: (2010)
Implementation of Integrated Project Delivery (IPD) and Building Information Modelling (BIM) in the construction industry
حسب: Kaini, Iman
منشور في: (2013)
حسب: Kaini, Iman
منشور في: (2013)
Collaborative procurement strategy in private sector housing projects using Industrialised Building Systems
حسب: Meynagh, Mahdi Moharrami
منشور في: (2017)
حسب: Meynagh, Mahdi Moharrami
منشور في: (2017)
Rainfall data in - filling model with expectation maximization and artificial neural network
حسب: Abdul Malek, Marlinda
منشور في: (2008)
حسب: Abdul Malek, Marlinda
منشور في: (2008)
The management of industrialized building systems (ibs) projects using radio-frequency identification (rfid) technology
حسب: Jamal, Muhammad Adib
منشور في: (2019)
حسب: Jamal, Muhammad Adib
منشور في: (2019)
Using artificial neural network to predict power plant turbine hall key cost drivers
حسب: Ng, Choo Geon
منشور في: (2007)
حسب: Ng, Choo Geon
منشور في: (2007)
Feasibility study on the implementation of medium rise industrialized building system (IBS) in Aleskan Alshaabi project in Khartoum
حسب: Elageb Adaam, Alaadein Abdusalam
منشور في: (2012)
حسب: Elageb Adaam, Alaadein Abdusalam
منشور في: (2012)
Challenges or constraints in the implementation of industrialised building system for projects under Jabatan Kerja Raya Negeri Perak
حسب: Shafie, Muhammad Shazni
منشور في: (2020)
حسب: Shafie, Muhammad Shazni
منشور في: (2020)
Seismic damage identification based on integrated artificial neural networks and wavelet transforms
حسب: Vafaei, Mohammadreza
منشور في: (2013)
حسب: Vafaei, Mohammadreza
منشور في: (2013)
Modelling of traffic control delays at priority junctions using artificial neural network
حسب: Sahraei, Mohammad Ali
منشور في: (2018)
حسب: Sahraei, Mohammad Ali
منشور في: (2018)
Minimizing variation order on construction project due to design change
حسب: Hamdan, Hazrin
منشور في: (2012)
حسب: Hamdan, Hazrin
منشور في: (2012)
مواد مشابهة
-
Construction bid model for residential building projects in Dubai
حسب: Al Janabi, Tamadhur H. F.
منشور في: (2018) -
Selection factor to bid or not to bid for extra low voltage system (ELV) project
حسب: Khairul Anuar, Mohamad Amir Syafiq
منشور في: (2019) -
Tunneling-induced ground movement and building damage prediction using hybrid artificial neural networks
حسب: Hajihassani, Mohsen
منشور في: (2013) -
Procurement methods and contractor's bidding strategy in Middle East construction industry
حسب: Amirsoleimani, Omidreza
منشور في: (2014) -
Risk management of design and build project
حسب: Amat Bakri, Nurul Khalida
منشور في: (2019)