Scheduling on transportation for industrialized building systems

Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illust...

詳細記述

書誌詳細
第一著者: Foong, Kok Li
フォーマット: 学位論文
言語:英語
出版事項: 2006
主題:
オンライン・アクセス:http://eprints.utm.my/4582/1/FoongKokLiMFKA2006.pdf