Problems associated with acceleration works and its solutions
Construction industry and delays are no longer a separable issue. In common practice, upon encountering delay the Contractor is either granted an Extension of Time (EOT) in the event of excusable delay or being charged for Liquidated Damages (LAD) in the event of non-excusable delay. Apart from thes...
| المؤلف الرئيسي: | Mohamad Nazir, Noor Jannah |
|---|---|
| التنسيق: | أطروحة |
| اللغة: | الإنجليزية |
| منشور في: |
2016
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://eprints.utm.my/60961/1/NoorJannahMohamadMFAB2016.pdf |
مواد مشابهة
Problems associated with evaluation of extension of time (EOT) claim in government projects
حسب: Mat Isa, Siti Aisah
منشور في: (2014)
حسب: Mat Isa, Siti Aisah
منشور في: (2014)
Factors affecting the preparation of the construction work programme
حسب: Mohamad, Mardiana
منشور في: (2016)
حسب: Mohamad, Mardiana
منشور في: (2016)
Implementation's issues and problems commissioner of building
حسب: Ab Rahim, Ainul Rasyidah
منشور في: (2008)
حسب: Ab Rahim, Ainul Rasyidah
منشور في: (2008)
Maintenance management problems in low-cost flats
حسب: Goh, Keng Chai
منشور في: (2003)
حسب: Goh, Keng Chai
منشور في: (2003)
Critical constraints of facility layout problem for Sultanah Bahiyah Library
حسب: Noorhadila, Mohd Bakeri
منشور في: (2021)
حسب: Noorhadila, Mohd Bakeri
منشور في: (2021)
Termination of contract : abandonment of work
حسب: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
منشور في: (2012)
حسب: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
منشور في: (2012)
Status of estimates for emergency work
حسب: Maidin, Noraini
منشور في: (2010)
حسب: Maidin, Noraini
منشور في: (2010)
A study of problems during construction stage for conventional housing project
حسب: Chong , Voon Yaw
منشور في: (2004)
حسب: Chong , Voon Yaw
منشور في: (2004)
Diminution in value of works due to deffects
حسب: Hashim, Norhaibati
منشور في: (2011)
حسب: Hashim, Norhaibati
منشور في: (2011)
Hidden Cost In Building Conservation Works
حسب: Wee, Li Woon
منشور في: (2011)
حسب: Wee, Li Woon
منشور في: (2011)
Measure of damages for defective building work
حسب: Wong, Bi Xia
منشور في: (2009)
حسب: Wong, Bi Xia
منشور في: (2009)
Design considerations, practices and problems : a survey of private consultant firm perspective
حسب: Ismail, Neza
منشور في: (2004)
حسب: Ismail, Neza
منشور في: (2004)
Health and safety in refurbishment projects involving demolition work
حسب: Rakhshanifar, Mansooreh
منشور في: (2013)
حسب: Rakhshanifar, Mansooreh
منشور في: (2013)
Analysis of industrialized building system block work with ETABS
حسب: Rahmat, Maziar Ghabel
منشور في: (2013)
حسب: Rahmat, Maziar Ghabel
منشور في: (2013)
The prevailing practice in deciding the practical completion of construction work
حسب: Mohd. Yunos, Mohammad Harith
منشور في: (2015)
حسب: Mohd. Yunos, Mohammad Harith
منشور في: (2015)
Termination procedures of projects by the public works department (PWD)
حسب: Sanusi, Intan Safina
منشور في: (2015)
حسب: Sanusi, Intan Safina
منشور في: (2015)
Interference: dispute associated with determination of own employment by contractor in construction
حسب: Kok, Wing Yan
منشور في: (2017)
حسب: Kok, Wing Yan
منشور في: (2017)
Pembinaan dan pengesahan instrumen persekitaran fizikal bilik darjah sekolah menengah di Malaysia
حسب: Nurul Jannah Amirul
منشور في: (2015)
حسب: Nurul Jannah Amirul
منشور في: (2015)
Executive information system for monitoring building construction work progress
حسب: Zakaria, Wan Zahran
منشور في: (2013)
حسب: Zakaria, Wan Zahran
منشور في: (2013)
Management of variation order in Public Work Department Malaysia construction project
حسب: Amir Mohamed, Sharil Amran
منشور في: (2013)
حسب: Amir Mohamed, Sharil Amran
منشور في: (2013)
Evaluation on current practice in work breakdown structure approach for construction schedules
حسب: Md. Isha, Mohd. Nasir
منشور في: (2004)
حسب: Md. Isha, Mohd. Nasir
منشور في: (2004)
Contractor's liability relating to defective works that are discovered after the defects liability period
حسب: Leong, Mei Wan
منشور في: (2010)
حسب: Leong, Mei Wan
منشور في: (2010)
Issues associates with communicating the architect notice by means of e-mail under PAM 2006
حسب: Sainee, Norazean
منشور في: (2015)
حسب: Sainee, Norazean
منشور في: (2015)
Contractor's liabilities towards employer's defective building work claims during defect liability period
حسب: Lim, Tze Shwan
منشور في: (2011)
حسب: Lim, Tze Shwan
منشور في: (2011)
Meshfree formulation for inverse frequencies analysis incorporating artificial neural network
حسب: Abd. Nazir, Mohd. Zhafri Jamil
منشور في: (2013)
حسب: Abd. Nazir, Mohd. Zhafri Jamil
منشور في: (2013)
The cost overruns in green building development : case study Ministry of Public Works new green building project Republic of Indonesia
حسب: Putro, Anggoro
منشور في: (2012)
حسب: Putro, Anggoro
منشور في: (2012)
Properties Of Foamed Concrete With Oil Palm Ash Inclusion And Its Application As An Interlocking Mortarless Block
حسب: Abdulameer, Mohammed Zuhear
منشور في: (2015)
حسب: Abdulameer, Mohammed Zuhear
منشور في: (2015)
An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
حسب: Mansor, Lydiana
منشور في: (2022)
حسب: Mansor, Lydiana
منشور في: (2022)
Development of a building energy analysis package (BEAP) and its application to the analysis of cool thermal energy storage systems
حسب: Senawi, Mohd. Yusoff
منشور في: (1999)
حسب: Senawi, Mohd. Yusoff
منشور في: (1999)
Punca dan impak perubahan kerja dalam projek milik UDA Holdings Berhad (UDA)
حسب: Abu Bakar, Mohamad Noor Ropiah
منشور في: (2008)
حسب: Abu Bakar, Mohamad Noor Ropiah
منشور في: (2008)
Prevalent Tender Preparation Practices For Building Conservation Works
حسب: Lee , Qin Yin
منشور في: (2009)
حسب: Lee , Qin Yin
منشور في: (2009)
Extension of time in commencement of arbitration proceedings
حسب: Mokhtar, Noor Halwani
منشور في: (2012)
حسب: Mokhtar, Noor Halwani
منشور في: (2012)
Issues relating to contract administrator's instruction
حسب: Khiyon, Noor Azeyah
منشور في: (2011)
حسب: Khiyon, Noor Azeyah
منشور في: (2011)
Flood damage and risk assessment for urban area in Segamat
حسب: Noor Suraya, Romali
منشور في: (2018)
حسب: Noor Suraya, Romali
منشور في: (2018)
Self assessment green building index for residential estates
حسب: Baharin, Noor Hamizah
منشور في: (2012)
حسب: Baharin, Noor Hamizah
منشور في: (2012)
Variation order in lump sum contract
حسب: Mohayidin, Noor Amalina
منشور في: (2014)
حسب: Mohayidin, Noor Amalina
منشور في: (2014)
Affordances of home-school journey as a play and learning environment for rural middle childhood children
حسب: Yatiman, Noor Ain
منشور في: (2014)
حسب: Yatiman, Noor Ain
منشور في: (2014)
A study on identifying factors affecting project performance on road construction project
حسب: Taufik, Mohamad
منشور في: (2012)
حسب: Taufik, Mohamad
منشور في: (2012)
The structural behaviour of precast lightweight foamed concrete sandwich panel as a load bearing wall
حسب: Mohamad, Noridah
منشور في: (2010)
حسب: Mohamad, Noridah
منشور في: (2010)
Challenges for improving the quality of the construction industry
حسب: Adnan, Noor Azizah
منشور في: (2008)
حسب: Adnan, Noor Azizah
منشور في: (2008)
مواد مشابهة
-
Problems associated with evaluation of extension of time (EOT) claim in government projects
حسب: Mat Isa, Siti Aisah
منشور في: (2014) -
Factors affecting the preparation of the construction work programme
حسب: Mohamad, Mardiana
منشور في: (2016) -
Implementation's issues and problems commissioner of building
حسب: Ab Rahim, Ainul Rasyidah
منشور في: (2008) -
Maintenance management problems in low-cost flats
حسب: Goh, Keng Chai
منشور في: (2003) -
Critical constraints of facility layout problem for Sultanah Bahiyah Library
حسب: Noorhadila, Mohd Bakeri
منشور في: (2021)