Problems associated with acceleration works and its solutions
Construction industry and delays are no longer a separable issue. In common practice, upon encountering delay the Contractor is either granted an Extension of Time (EOT) in the event of excusable delay or being charged for Liquidated Damages (LAD) in the event of non-excusable delay. Apart from thes...
| Main Author: | Mohamad Nazir, Noor Jannah |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2016
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/60961/1/NoorJannahMohamadMFAB2016.pdf |
Similar Items
Problems associated with evaluation of extension of time (EOT) claim in government projects
by: Mat Isa, Siti Aisah
Published: (2014)
by: Mat Isa, Siti Aisah
Published: (2014)
Factors affecting the preparation of the construction work programme
by: Mohamad, Mardiana
Published: (2016)
by: Mohamad, Mardiana
Published: (2016)
Implementation's issues and problems commissioner of building
by: Ab Rahim, Ainul Rasyidah
Published: (2008)
by: Ab Rahim, Ainul Rasyidah
Published: (2008)
Maintenance management problems in low-cost flats
by: Goh, Keng Chai
Published: (2003)
by: Goh, Keng Chai
Published: (2003)
Critical constraints of facility layout problem for Sultanah Bahiyah Library
by: Noorhadila, Mohd Bakeri
Published: (2021)
by: Noorhadila, Mohd Bakeri
Published: (2021)
Termination of contract : abandonment of work
by: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
Published: (2012)
by: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
Published: (2012)
Status of estimates for emergency work
by: Maidin, Noraini
Published: (2010)
by: Maidin, Noraini
Published: (2010)
A study of problems during construction stage for conventional housing project
by: Chong , Voon Yaw
Published: (2004)
by: Chong , Voon Yaw
Published: (2004)
Diminution in value of works due to deffects
by: Hashim, Norhaibati
Published: (2011)
by: Hashim, Norhaibati
Published: (2011)
Hidden Cost In Building Conservation Works
by: Wee, Li Woon
Published: (2011)
by: Wee, Li Woon
Published: (2011)
Measure of damages for defective building work
by: Wong, Bi Xia
Published: (2009)
by: Wong, Bi Xia
Published: (2009)
Design considerations, practices and problems : a survey of private consultant firm perspective
by: Ismail, Neza
Published: (2004)
by: Ismail, Neza
Published: (2004)
Health and safety in refurbishment projects involving demolition work
by: Rakhshanifar, Mansooreh
Published: (2013)
by: Rakhshanifar, Mansooreh
Published: (2013)
Analysis of industrialized building system block work with ETABS
by: Rahmat, Maziar Ghabel
Published: (2013)
by: Rahmat, Maziar Ghabel
Published: (2013)
The prevailing practice in deciding the practical completion of construction work
by: Mohd. Yunos, Mohammad Harith
Published: (2015)
by: Mohd. Yunos, Mohammad Harith
Published: (2015)
Termination procedures of projects by the public works department (PWD)
by: Sanusi, Intan Safina
Published: (2015)
by: Sanusi, Intan Safina
Published: (2015)
Interference: dispute associated with determination of own employment by contractor in construction
by: Kok, Wing Yan
Published: (2017)
by: Kok, Wing Yan
Published: (2017)
Pembinaan dan pengesahan instrumen persekitaran fizikal bilik darjah sekolah menengah di Malaysia
by: Nurul Jannah Amirul
Published: (2015)
by: Nurul Jannah Amirul
Published: (2015)
Executive information system for monitoring building construction work progress
by: Zakaria, Wan Zahran
Published: (2013)
by: Zakaria, Wan Zahran
Published: (2013)
Management of variation order in Public Work Department Malaysia construction project
by: Amir Mohamed, Sharil Amran
Published: (2013)
by: Amir Mohamed, Sharil Amran
Published: (2013)
Evaluation on current practice in work breakdown structure approach for construction schedules
by: Md. Isha, Mohd. Nasir
Published: (2004)
by: Md. Isha, Mohd. Nasir
Published: (2004)
Contractor's liability relating to defective works that are discovered after the defects liability period
by: Leong, Mei Wan
Published: (2010)
by: Leong, Mei Wan
Published: (2010)
Issues associates with communicating the architect notice by means of e-mail under PAM 2006
by: Sainee, Norazean
Published: (2015)
by: Sainee, Norazean
Published: (2015)
Contractor's liabilities towards employer's defective building work claims during defect liability period
by: Lim, Tze Shwan
Published: (2011)
by: Lim, Tze Shwan
Published: (2011)
Meshfree formulation for inverse frequencies analysis incorporating artificial neural network
by: Abd. Nazir, Mohd. Zhafri Jamil
Published: (2013)
by: Abd. Nazir, Mohd. Zhafri Jamil
Published: (2013)
The cost overruns in green building development : case study Ministry of Public Works new green building project Republic of Indonesia
by: Putro, Anggoro
Published: (2012)
by: Putro, Anggoro
Published: (2012)
Properties Of Foamed Concrete With Oil Palm Ash Inclusion And Its Application As An Interlocking Mortarless Block
by: Abdulameer, Mohammed Zuhear
Published: (2015)
by: Abdulameer, Mohammed Zuhear
Published: (2015)
An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
by: Mansor, Lydiana
Published: (2022)
by: Mansor, Lydiana
Published: (2022)
Development of a building energy analysis package (BEAP) and its application to the analysis of cool thermal energy storage systems
by: Senawi, Mohd. Yusoff
Published: (1999)
by: Senawi, Mohd. Yusoff
Published: (1999)
Punca dan impak perubahan kerja dalam projek milik UDA Holdings Berhad (UDA)
by: Abu Bakar, Mohamad Noor Ropiah
Published: (2008)
by: Abu Bakar, Mohamad Noor Ropiah
Published: (2008)
Prevalent Tender Preparation Practices For Building Conservation Works
by: Lee , Qin Yin
Published: (2009)
by: Lee , Qin Yin
Published: (2009)
Extension of time in commencement of arbitration proceedings
by: Mokhtar, Noor Halwani
Published: (2012)
by: Mokhtar, Noor Halwani
Published: (2012)
Issues relating to contract administrator's instruction
by: Khiyon, Noor Azeyah
Published: (2011)
by: Khiyon, Noor Azeyah
Published: (2011)
Flood damage and risk assessment for urban area in Segamat
by: Noor Suraya, Romali
Published: (2018)
by: Noor Suraya, Romali
Published: (2018)
Self assessment green building index for residential estates
by: Baharin, Noor Hamizah
Published: (2012)
by: Baharin, Noor Hamizah
Published: (2012)
Variation order in lump sum contract
by: Mohayidin, Noor Amalina
Published: (2014)
by: Mohayidin, Noor Amalina
Published: (2014)
Affordances of home-school journey as a play and learning environment for rural middle childhood children
by: Yatiman, Noor Ain
Published: (2014)
by: Yatiman, Noor Ain
Published: (2014)
A study on identifying factors affecting project performance on road construction project
by: Taufik, Mohamad
Published: (2012)
by: Taufik, Mohamad
Published: (2012)
The structural behaviour of precast lightweight foamed concrete sandwich panel as a load bearing wall
by: Mohamad, Noridah
Published: (2010)
by: Mohamad, Noridah
Published: (2010)
Challenges for improving the quality of the construction industry
by: Adnan, Noor Azizah
Published: (2008)
by: Adnan, Noor Azizah
Published: (2008)
Similar Items
-
Problems associated with evaluation of extension of time (EOT) claim in government projects
by: Mat Isa, Siti Aisah
Published: (2014) -
Factors affecting the preparation of the construction work programme
by: Mohamad, Mardiana
Published: (2016) -
Implementation's issues and problems commissioner of building
by: Ab Rahim, Ainul Rasyidah
Published: (2008) -
Maintenance management problems in low-cost flats
by: Goh, Keng Chai
Published: (2003) -
Critical constraints of facility layout problem for Sultanah Bahiyah Library
by: Noorhadila, Mohd Bakeri
Published: (2021)