Problems associated with acceleration works and its solutions
Construction industry and delays are no longer a separable issue. In common practice, upon encountering delay the Contractor is either granted an Extension of Time (EOT) in the event of excusable delay or being charged for Liquidated Damages (LAD) in the event of non-excusable delay. Apart from thes...
| Auteur principal: | Mohamad Nazir, Noor Jannah |
|---|---|
| Format: | Thèse |
| Langue: | anglais |
| Publié: |
2016
|
| Sujets: | |
| Accès en ligne: | http://eprints.utm.my/60961/1/NoorJannahMohamadMFAB2016.pdf |
Documents similaires
Problems associated with evaluation of extension of time (EOT) claim in government projects
par: Mat Isa, Siti Aisah
Publié: (2014)
par: Mat Isa, Siti Aisah
Publié: (2014)
Factors affecting the preparation of the construction work programme
par: Mohamad, Mardiana
Publié: (2016)
par: Mohamad, Mardiana
Publié: (2016)
Implementation's issues and problems commissioner of building
par: Ab Rahim, Ainul Rasyidah
Publié: (2008)
par: Ab Rahim, Ainul Rasyidah
Publié: (2008)
Maintenance management problems in low-cost flats
par: Goh, Keng Chai
Publié: (2003)
par: Goh, Keng Chai
Publié: (2003)
Critical constraints of facility layout problem for Sultanah Bahiyah Library
par: Noorhadila, Mohd Bakeri
Publié: (2021)
par: Noorhadila, Mohd Bakeri
Publié: (2021)
Termination of contract : abandonment of work
par: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
Publié: (2012)
par: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
Publié: (2012)
Status of estimates for emergency work
par: Maidin, Noraini
Publié: (2010)
par: Maidin, Noraini
Publié: (2010)
A study of problems during construction stage for conventional housing project
par: Chong , Voon Yaw
Publié: (2004)
par: Chong , Voon Yaw
Publié: (2004)
Diminution in value of works due to deffects
par: Hashim, Norhaibati
Publié: (2011)
par: Hashim, Norhaibati
Publié: (2011)
Hidden Cost In Building Conservation Works
par: Wee, Li Woon
Publié: (2011)
par: Wee, Li Woon
Publié: (2011)
Measure of damages for defective building work
par: Wong, Bi Xia
Publié: (2009)
par: Wong, Bi Xia
Publié: (2009)
Design considerations, practices and problems : a survey of private consultant firm perspective
par: Ismail, Neza
Publié: (2004)
par: Ismail, Neza
Publié: (2004)
Health and safety in refurbishment projects involving demolition work
par: Rakhshanifar, Mansooreh
Publié: (2013)
par: Rakhshanifar, Mansooreh
Publié: (2013)
Analysis of industrialized building system block work with ETABS
par: Rahmat, Maziar Ghabel
Publié: (2013)
par: Rahmat, Maziar Ghabel
Publié: (2013)
The prevailing practice in deciding the practical completion of construction work
par: Mohd. Yunos, Mohammad Harith
Publié: (2015)
par: Mohd. Yunos, Mohammad Harith
Publié: (2015)
Termination procedures of projects by the public works department (PWD)
par: Sanusi, Intan Safina
Publié: (2015)
par: Sanusi, Intan Safina
Publié: (2015)
Interference: dispute associated with determination of own employment by contractor in construction
par: Kok, Wing Yan
Publié: (2017)
par: Kok, Wing Yan
Publié: (2017)
Pembinaan dan pengesahan instrumen persekitaran fizikal bilik darjah sekolah menengah di Malaysia
par: Nurul Jannah Amirul
Publié: (2015)
par: Nurul Jannah Amirul
Publié: (2015)
Executive information system for monitoring building construction work progress
par: Zakaria, Wan Zahran
Publié: (2013)
par: Zakaria, Wan Zahran
Publié: (2013)
Management of variation order in Public Work Department Malaysia construction project
par: Amir Mohamed, Sharil Amran
Publié: (2013)
par: Amir Mohamed, Sharil Amran
Publié: (2013)
Evaluation on current practice in work breakdown structure approach for construction schedules
par: Md. Isha, Mohd. Nasir
Publié: (2004)
par: Md. Isha, Mohd. Nasir
Publié: (2004)
Contractor's liability relating to defective works that are discovered after the defects liability period
par: Leong, Mei Wan
Publié: (2010)
par: Leong, Mei Wan
Publié: (2010)
Issues associates with communicating the architect notice by means of e-mail under PAM 2006
par: Sainee, Norazean
Publié: (2015)
par: Sainee, Norazean
Publié: (2015)
Contractor's liabilities towards employer's defective building work claims during defect liability period
par: Lim, Tze Shwan
Publié: (2011)
par: Lim, Tze Shwan
Publié: (2011)
Meshfree formulation for inverse frequencies analysis incorporating artificial neural network
par: Abd. Nazir, Mohd. Zhafri Jamil
Publié: (2013)
par: Abd. Nazir, Mohd. Zhafri Jamil
Publié: (2013)
The cost overruns in green building development : case study Ministry of Public Works new green building project Republic of Indonesia
par: Putro, Anggoro
Publié: (2012)
par: Putro, Anggoro
Publié: (2012)
Properties Of Foamed Concrete With Oil Palm Ash Inclusion And Its Application As An Interlocking Mortarless Block
par: Abdulameer, Mohammed Zuhear
Publié: (2015)
par: Abdulameer, Mohammed Zuhear
Publié: (2015)
An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
par: Mansor, Lydiana
Publié: (2022)
par: Mansor, Lydiana
Publié: (2022)
Development of a building energy analysis package (BEAP) and its application to the analysis of cool thermal energy storage systems
par: Senawi, Mohd. Yusoff
Publié: (1999)
par: Senawi, Mohd. Yusoff
Publié: (1999)
Punca dan impak perubahan kerja dalam projek milik UDA Holdings Berhad (UDA)
par: Abu Bakar, Mohamad Noor Ropiah
Publié: (2008)
par: Abu Bakar, Mohamad Noor Ropiah
Publié: (2008)
Prevalent Tender Preparation Practices For Building Conservation Works
par: Lee , Qin Yin
Publié: (2009)
par: Lee , Qin Yin
Publié: (2009)
Extension of time in commencement of arbitration proceedings
par: Mokhtar, Noor Halwani
Publié: (2012)
par: Mokhtar, Noor Halwani
Publié: (2012)
Issues relating to contract administrator's instruction
par: Khiyon, Noor Azeyah
Publié: (2011)
par: Khiyon, Noor Azeyah
Publié: (2011)
Flood damage and risk assessment for urban area in Segamat
par: Noor Suraya, Romali
Publié: (2018)
par: Noor Suraya, Romali
Publié: (2018)
Self assessment green building index for residential estates
par: Baharin, Noor Hamizah
Publié: (2012)
par: Baharin, Noor Hamizah
Publié: (2012)
Variation order in lump sum contract
par: Mohayidin, Noor Amalina
Publié: (2014)
par: Mohayidin, Noor Amalina
Publié: (2014)
Affordances of home-school journey as a play and learning environment for rural middle childhood children
par: Yatiman, Noor Ain
Publié: (2014)
par: Yatiman, Noor Ain
Publié: (2014)
A study on identifying factors affecting project performance on road construction project
par: Taufik, Mohamad
Publié: (2012)
par: Taufik, Mohamad
Publié: (2012)
The structural behaviour of precast lightweight foamed concrete sandwich panel as a load bearing wall
par: Mohamad, Noridah
Publié: (2010)
par: Mohamad, Noridah
Publié: (2010)
Challenges for improving the quality of the construction industry
par: Adnan, Noor Azizah
Publié: (2008)
par: Adnan, Noor Azizah
Publié: (2008)
Documents similaires
-
Problems associated with evaluation of extension of time (EOT) claim in government projects
par: Mat Isa, Siti Aisah
Publié: (2014) -
Factors affecting the preparation of the construction work programme
par: Mohamad, Mardiana
Publié: (2016) -
Implementation's issues and problems commissioner of building
par: Ab Rahim, Ainul Rasyidah
Publié: (2008) -
Maintenance management problems in low-cost flats
par: Goh, Keng Chai
Publié: (2003) -
Critical constraints of facility layout problem for Sultanah Bahiyah Library
par: Noorhadila, Mohd Bakeri
Publié: (2021)