Creep and thermal response of long span prestressed concrete integral abutment bridge

Integral Abutment Bridges (IAB) are getting popular due to significant cost savings in their construction and maintenance. Many countries stipulate the use of IABs in their new bridge construction projects but mostly the span is limited to 60 m. The limit is set considering the concerns on the long-...

全面介紹

書目詳細資料
主要作者: Muhammad, Akilu
格式: Thesis
語言:英语
出版: 2017
主題:
在線閱讀:http://eprints.utm.my/79228/1/AkiluMuhammadPFKA2017.pdf