Creep and thermal response of long span prestressed concrete integral abutment bridge

Integral Abutment Bridges (IAB) are getting popular due to significant cost savings in their construction and maintenance. Many countries stipulate the use of IABs in their new bridge construction projects but mostly the span is limited to 60 m. The limit is set considering the concerns on the long-...

詳細記述

書誌詳細
第一著者: Muhammad, Akilu
フォーマット: 学位論文
言語:英語
出版事項: 2017
主題:
オンライン・アクセス:http://eprints.utm.my/79228/1/AkiluMuhammadPFKA2017.pdf