Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant
In order to ensure the asset integrity, all unfired pressure vessels (UPVs) should be examined at the intervals recommended in inspection codes or risk-based inspection (RBI) assessment. RBI assessment may allow previous inspection intervals to be extended and the inspection method may be reselected...
| 第一著者: | |
|---|---|
| フォーマット: | 学位論文 | 
| 言語: | 英語 | 
| 出版事項: | 
          
        2016
     | 
| 主題: | |
| オンライン・アクセス: | http://eprints.utm.my/81429/1/SawPingLihMFKM2016.pdf |