Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant
In order to ensure the asset integrity, all unfired pressure vessels (UPVs) should be examined at the intervals recommended in inspection codes or risk-based inspection (RBI) assessment. RBI assessment may allow previous inspection intervals to be extended and the inspection method may be reselected...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2016
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/81429/1/SawPingLihMFKM2016.pdf |