Enhancement of scheduling system interfaces and functionalities case study : Asian Institute of Medical, Science and Technology (AIMST) scheduling system

The purpose of the AIMST project is to produce a scheduling system for AIMST that allows the user to setup scheduling time for selected control unit and monitoring the control unit based on the scheduling time given. The issue that arises is that the AIMST system was developed based on the requireme...

詳細記述

書誌詳細
第一著者: Abdul Jalal, Nordahlia
フォーマット: 学位論文
言語:英語
出版事項: 2008
主題:
オンライン・アクセス:http://eprints.utm.my/9577/1/NordahliaAbdulJalalMFSKSM2008.pdf