Risk based analysis for detention pond overflow at Iskandar Malaysia (Nusajaya), Johor
Overflow risk of detention pond is defined as the probability of having a rainfall event that produces a runoff volume more than the available storage capacity of detention pond. Overflow risk analysis depends on the waiting period (elapse time) and draining time. This study dealt with risk analysis...
| Auteur principal: | |
|---|---|
| Format: | Thèse |
| Langue: | anglais |
| Publié: |
2008
|
| Sujets: | |
| Accès en ligne: | http://eprints.utm.my/9863/1/ZulizianaSuifMFKM2008.pdf |