Risk based analysis for detention pond overflow at Iskandar Malaysia (Nusajaya), Johor
Overflow risk of detention pond is defined as the probability of having a rainfall event that produces a runoff volume more than the available storage capacity of detention pond. Overflow risk analysis depends on the waiting period (elapse time) and draining time. This study dealt with risk analysis...
| मुख्य लेखक: | |
|---|---|
| स्वरूप: | थीसिस |
| भाषा: | अंग्रेज़ी |
| प्रकाशित: |
2008
|
| विषय: | |
| ऑनलाइन पहुंच: | http://eprints.utm.my/9863/1/ZulizianaSuifMFKM2008.pdf |