Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant

In order to ensure the asset integrity, all unfired pressure vessels (UPVs) should be examined at the intervals recommended in inspection codes or risk-based inspection (RBI) assessment. RBI assessment may allow previous inspection intervals to be extended and the inspection method may be reselected...

وصف كامل

التفاصيل البيبلوغرافية
المؤلف الرئيسي: Saw, Ping Lih
التنسيق: أطروحة
اللغة:الإنجليزية
منشور في: 2016
الموضوعات:
الوصول للمادة أونلاين:http://eprints.utm.my/81429/1/SawPingLihMFKM2016.pdf