Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant
In order to ensure the asset integrity, all unfired pressure vessels (UPVs) should be examined at the intervals recommended in inspection codes or risk-based inspection (RBI) assessment. RBI assessment may allow previous inspection intervals to be extended and the inspection method may be reselected...
| 主要作者: | |
|---|---|
| 格式: | Thesis |
| 语言: | 英语 |
| 出版: |
2016
|
| 主题: | |
| 在线阅读: | http://eprints.utm.my/81429/1/SawPingLihMFKM2016.pdf |